ABOUT US
ABOUT US
LOCATION
Located 50 minutes by car from the center of Ho Chi Minh City, 40 minutes from Cat Lai Port, 60 minutes from the Cai Mep - Thi Vai New Port, and 20 minutes away from the upcoming Long Thanh New International Airport (expected opening for operation in 2026), with convenient location for both transportation and daily commuting, it is highly suitable for manufacturing businesses.
With an elevation of 39 to 44 meters above sea level, the location boasts an extremely low risk of flooding. Furthermore, with a ground bearing capacity of 10 to 15 tons per square meter, it offers favorable conditions for reducing construction costs and shortening construction periods.
CORE INFRASTRUCTURE
For manufacturing operations where a reliable power supply is crucial, the industrial park receives electricity from Vietnam Electricity (EVN) via both main and backup transmission lines, and supplies it to tenant companies. Natural gas is also provided through a pipeline network built within the park.
Specialized staff are stationed 24/7 at all infrastructure facilities- including electricity, industrial water supply, and wastewater treatment - ensuring an immediate response in the event of an emergency.
ADDITIONAL INFRASTRUCTURE
High-speed fiber-optic networks are installed throughout the premises, providing one-stop IT services, including IT-related consultation.
GAS SUPPLY PLANT
Gas Supply System is built in Industrial Park by Sojitz Group
Domestic Natural gas is provided through pipelines within the Industrial Park
24/7 management and maintenance by professional staff
ELECTRIC PLANT
Electric power of Industrial Park is received from two systems in the Industrial Park: a main transmission system and a backup transmission system. This will ensure a stable supply of power and provide it to tenants
24/7 management and maintenance by professional staff
RENTAL FACTORY 2
Completed in 2020
Providing conditions for investors to reduce both initial investment time and costs, and to be able to start production operations
Variety of areas from 500m² depend on needs
RENTAL FACTORY 3
Completed in 2018
Providing conditions for investors to reduce both initial investment time and costs, and to be able to start production operations
Variety of areas from 500m² depend on needs
WAREHOUSE
RENTAL FACTORY 1
Completed in 2014
Providing conditions for investors to reduce both initial investment time and costs, and to be able to start production operations
Variety of areas from 500m² depend on needs
WASTEWATER
TREATMENT PLANT
The management, operation and maintenance is carried out by Kobelco Eco-Solutions Co.,Ltd. - an experienced company in Vietnam
24/7 management and maintenance by professional staff
SERVICE CENTER
Management Office
Rental Offices
IT Support Centers
Japanese Restaurants, ATMs, etc.
WATER SUPPLY
STATION
Water is supplied from the water purification plant operated by Dong Nai Waterworks Corporation with supply capacity of 11,000 m3 per day and supplied to the tenant companies by pumping
24/7 management and maintenance by professional staff
SERVICE CENTER
Customs Sub-department
-
01
Gas supply plant
-
06
RENTAL FACTORY 1
-
02
Electric plant
-
07
Wastewater
treatment plant -
03
RENTAL FACTORY 2
-
08
Service center
-
04
RENTAL FACTORY 3
-
09
Water supply station
-
05
Warehouse
COMPREHENSIVE SUPPORT
From the phase of investment evaluation to the handover of the factory, our dedicated team of Japanese staff provides comprehensive support for businesses, including assistance with administrative procedures such as drafting and submitting applications for company establishment permits, etc. After receiving the factory, we organize monthly meetings for tenant businesses (bringing together representatives from each tenant), where they can update on the latest legal information and regulations and exchange information with each other.
Vision
The goal
Slogan
Growing beyond.
Commitment
Long Duc aims to grow together and contribute to a sustainable society through the following commitments.
-
Sincere
We sincerely address consultations and inquiries from our tenants.
-
Reliable
We handle various procedures based on our experience and knowledge.
-
Considerate
We respond from the operational perspective of our tenant companies.
-
Responsible
We sincerely address and resolve the operational problems and challenges of our tenant companies.
-
Ambitious
We are committed to operating industrial parks and improving our services.
-
Coachable
We incorporate feedback from tenant companies and internal staff to improve our operations.
HISTORY
-
Prologue
-
2011
-
August
Sojitz Corporation has entered into the project to develop "Long Duc Industrial Park" by acquiring shares in Long Duc Investment JSC
-
-
-
Development stage
-
2012
-
March
Began land development and infrastructure construction
-
-
2013
-
Completed industrial park development (July), Started commercial operation (September)
-
August
Completed construction of Rental Factory No.1/Rental warehouse, started leasing
-
-
-
Business stage
-
2017
-
December
Completed the construction of Rental Factory No.2-Phase 1 and started leasing
-
-
2019
-
Completed the sales of all the land
-
-
-
Operations Stage
-
2020
-
October
Completed the construction of Rental Factory No.2-Phase 2 completed
-
-
2023
-
August
Acquired a rental factory (the 3rd rental factory) owned by Daiwa House Industry
Celebrated the 10th anniversary of operations
-
-
2024
-
August
Sojitz Corporation has increased shareholding ratio from 50.2% to 88%.
-
-
-
Transformation stage
-
2026
-
March
Achieved 100% occupancy for rental factories
-
April
Changed company name to SOJITZ INFRASTRUCTURE VIETNAM CO., LTD.
-
-
COMPANY PROFILE
Company name
LONG DUC Industrial Park
Location
Long Duc Industrial Park, Binh An Commune, Dong Nai City, Vietnam
Business owner
SOJITZ INFRASTRUCTURE VIETNAM COMPANY LIMITED
※Renamed from the former Long Duc Investment Company Limited on April 1, 2026.
Shareholders
Sojitz Corporation 88%
Dona Foods 12%
Total Land Area
270 hectares
Rental Area
Approx. 203 hectares
- Land for factory: approx. 190 hectares
- Rental Warehouse: approx. 1.1 hectares
- Rental Factory 1: approx. 2.3 hectares
- Rental Factory 2: approx. 4.1 hectares
- Rental Factory 3: approx. 6.0 hectares
Number of tenants
77 companies
- Land: 34 companies
- Rental Warehouse: 1 company
- Rental Factory: 42 companies

